2010 Upcoming Event CADStation and Asta Development will be attending PMOZ (www.pmoz.com.au) at the Brisbane Convention Centre.
Come visit us at Booth 15 at the Trade Exhibition from 23rd-26th August 2010.
Move from 3D to 4D planning Synchro is able to synchronize the Asta schedule of activities and CAD drawings to simulate and optimize a graphic visual simulation 4D approach to deliver and improve construction solutions for the management of construction projects.
With Synchro, an entire construction delivery team—owners, engineers, architects, operators, contractors, sub-contractors, manufacturers and materials suppliers—can share a single view of the entire project in real time.
Click here. »   to watch 4D modelling of Synchro and Asta Powerproject .AVI on YouTube of the Shard at London.
Asta Powerproject Ver11 Now Available Asta Powerproject Version 11 has arrived with more improvements designed to handle current business challenges. If you are currently under our Software Support, contact us to get you free upgrade.
Find out more »
          What's New?           Download Brochure
Asta Teamplan Resource Management Read the white paper research that shows how Teamplan is a solution that can help organisation manage people, processes and finances across multiple projects.
Find out more »
          download
Construction Management Startup Uses Prolog ® With $6M in revenues and a $10M backlog, Catalyst needed a way to manage six or eight large projects with a shoestring staff. Download the Catalyst case study to find out how.           download
Linear Planning in Pipeline Construction A case study how to use TILOS in pipeline industry for scheduling and controlling construction works. Download the case study on Linear Planning in pipeline to find out how.           download



Documents to Download